Buckreef Gold TRX GOLD

TanGold July 2020, Presentation

Corporate Presentation  July 2020

Buckreef Resources More than Doubled

  • M&I gold resources for the Buckreef Shear Zone more than doubled compared to the previous estimate
  • Incorporates the results of the 2019 Phase I and II drill program (52 holes, 17,650 m)
    • ‒  Phase I: 15-hole infill drilling of the PFS open pit to convert inferred to M&I resources
    • ‒  Phase II: 37-hole expansion drilling extended shear zone by >200 m along strike and to 950 m depth
  • Low discovery cost of only US$6/oz Au

Oxide Ores At Or Near Surface

  • Contain less than 2% of the gold in the PFS open pit. More suitable to be treated by a separate smaller plant.
  • Initial focus is to mine and stockpile up to 1 million tonnes from the proposed oxide pit
  • Oxide pit extends over a 37,000 m2 area
  • 0.5 to 1.0 m of overburden above oxide pit
  • Existing stockpiles of 120K tonnes at 1.86 g/t Au containing 7,161 oz Au
  • Plant at ~5 tph of set to expand to treat ~15 tph (300 tpd)
  • Flow sheet to include conventional gravity and cyanide leaching CIL with cyclones and centrifuges
  • Previous metallurgical testing indicates high recoveries
Logo Pipeda
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.