Tanzanian Gold Announces End of Phase I In-Pit Drilling Program.
The final three holes of this phase intersected significant intervals of continuous gold mineralization. Highlights within the pit include 29.6m @ 2.8 g/t Gold incl. 1.0m @ 47.7 g/t Gold and 21.0m @ 2.8 g/t Gold incl. 1.0m @ 19 g/t Gold and Highlights Outside and Below the pit include 89.6m @ 1.5 g/t Gold incl. 2.0m @ 16.6 g/t Gold